Phase 4 - Windows Installing & misc

Date: 2012 - August 15th - September 3rd

 

The windows were a feat to get to us ordered from France. The Bieber windows, no relation, are amazing!

Eastern French window box before ins

Eastern French window box before ins

South View

South View

Kitchen Windows

Kitchen Windows

Master bedroom French window to roof

Master bedroom French window to roof

Framing a window before installation

Framing a window before installation

Super glue seal for windows

Super glue seal for windows

Northern kitchen window from inside

Northern kitchen window from inside

Windows open upwards

Windows open upwards

Insulation of eastern walls junction

Insulation of eastern walls junction

4x4 mobile lift

4x4 mobile lift

Windows Installed

Windows Installed

View of North facade from Alda Road

View of North facade from Alda Road

xfs_700x570_s75_french window opens this way too.jpg

xfs_700x570_s75_french window opens this way too.jpg

Northeast windows installed & taped

Northeast windows installed & taped

Bieber window details, fabulous!

Bieber window details, fabulous!

South Facade

South Facade

Framing as windows are going in.

South West windows

South West windows

Master bedroom windows are in, their boxes protect until windows are fully taped and sealed

All 2nd floor windows installed

All 2nd floor windows installed